Precision Concrete Garage & Basement Floors
Perfectly leveled, machine-troweled interior concrete pours for garages, basement renovations and home extensions.
- Finish
- Power troweled
- Level
- Laser and screed
- Moisture
- Poly vapor barrier
- Reinforcement
- Mesh or rebar
- Cure
- 28-day reference
- Use
- Garage, basement, addition
Structure
The Foundation of Your Interior Space
Interior pours require a different skill set: millimeter-level planning, moisture control, access management and clean detailing around walls and services.
Perfectly level
Critical for framing, garage doors, flooring systems and future finishes.
Moisture barriers
Proper poly beneath the slab helps prevent damp interior spaces.
Machine-troweled finish
A dense, smooth surface that is easy to sweep, mop and prepare for epoxy.
Options
Interior Concrete Services
The right floor depends on use, access and the finishes planned above it.
Garage floors
Sloped toward doors or drains to manage melting snow from vehicles.
Basement slabs & underpinning
New floors after foundation repairs, trenching or basement lowering.
Home extensions & sunrooms
New slabs tied cleanly into a renovation or addition.
Process
How We Execute Interior Pours
- 01 Sub-grade & Vapor Barrier Prep The sub-base and poly are prepared before reinforcement.
- 02 Wire Mesh / Rebar Placement Reinforcement is placed while coordinating with plumbing, electrical and radiant heating where applicable.
- 03 The Pour & Laser Leveling Concrete is placed and brought to the planned elevation.
- 04 Power Troweling The surface is densified into a hard, clean finish.
Portfolio
Recent Interior Concrete Projects
A selection of Prestigia work to show possible finishes, volumes and details.



Trust
Precision Shows Up Later
Controlled moisture
Poly and edge details reduce future surprises.
Consistent level
Future finishes depend on the raw slab.
Planned access
Pumps, windows and openings need to be solved before concrete day.
FAQ
FAQ: Interior Concrete Floors
Do you install radiant in-floor heating?
Prestigia can pour over a coordinated radiant installation. Supplying, testing and owning the heating system should be clarified with the plumbing or radiant specialist before the pour.
Is the floor ready for epoxy right away?
No. Epoxy or paint usually needs a full cure, often around 28 days, plus any required moisture testing.
How do you get concrete into a basement?
Depending on access, a concrete line pump can move the mix through a window or prepared opening.
Get in touch
Start Your Renovation on Solid Ground
A successful interior slab is planned around access, final elevation, moisture and the other trades on site.